There are seven annexes associated with PSEAH in IFIs: Progress, Gaps and the Road Ahead:
Annex A - Methodology: How this study was conducted
Annex B - Detailed synthesis of performance
Annex C - Entry points for PSEAH in operations
Annex D - Definitions used by IFIs
Annex E Terminology used in this report
Annex F - Additional information on Guidelines and Good Practice Notes
Annex G - Annex references